Completed Project
AL-QIM SUBSTATION
TAIF
MV Cable Pulling & Termination
- Taif, Saudi Arabia
Project Overview
The Al-Qim Substation project involved the execution of Medium Voltage (MV) cable pulling and termination works for the electrical distribution network. The project was carried out by experienced technical personnel, ensuring safe installation, proper cable routing, and reliable electrical connections in accordance with project specifications and industry standards.
The successful completion of the project contributed to the operational readiness and long-term reliability of the substation infrastructure.
technical service performed
MV Cable Pulling
Electrical Installation Support
MV Cable Termination
Cable Identification & Tagging
Cable Routing & Dressing
Quality Inspection & Verification
Cable Glanding & Lugging
Safety Compliance Implementation
Project Gallary
Project Information
Location
Taif, Saudi Arabia
Client
Al-Qim Substation Project
Sector
Power & Utilities
Completion
Completed
Project type
MV Cable Pulling & Termination
scope
Medium Voltage Cable Pulling, Cable Routing, Glanding, Lugging & Termination Works